The issue

This customer was having ongoing issues with the roller doors breaking down at their waste management facility.

The site is subject to strict odour control procedures to minimise the impact of the factory’s operations on the surrounding neighbourhood.

Due to frequent breakdowns, their operation performance was affected, and they were receiving a lot of complaints from nearby residents.

case study 2 before

The Solution

After a thorough investigation, we found that old control panels were in poor condition and were contributing to the problem.

Our team designed, built, and installed new panels which have since been integrated with the existing odour control system.

These new control panels have resolved the issues with endless breakdowns, resulting in yet another satisfied customer.

case study 2

Recent case studies

View all

Waste Processing

A fast recovery for a large waste processing plant in Yorkshire

Our expert team developed a new control module that was an improvement on the human machine interface (HMI) and led to a much more durable setup.

Poultry Facility

Improving performance at a poultry processing facility in Lincolnshire

Our team designed, built, and installed new panels which have since been integrated with the existing odour control system.

Poultry Processing Factory

A speedy service for a poultry processing factory in the West Midlands

Thanks to extensive pre-planning, the operation was well executed, and the decommission was completed on time.