The issue

This customer asked IEAS to conduct the decommissioning of an old chicken processing line to prepare space for a new upgraded line.

The entire operation had to be finished in a very narrow window of time – in fact, the brief specified that the entire makeover needed to be completed in a 48 hour window.

case study 3

The Solution

We created a detailed plan that considered all key aspects of the project. Thanks to extensive pre-planning, the operation was well executed, and the decommission was completed on time.

The customer was very impressed with our meticulous organisation, not to mention how smooth the process was from start to finish.

case study 3