A speedy service for a poultry processing factory in the West Midlands
The issue
This customer asked IEAS to conduct the decommissioning of an old chicken processing line to prepare space for a new upgraded line.
The entire operation had to be finished in a very narrow window of time – in fact, the brief specified that the entire makeover needed to be completed in a 48 hour window.
The Solution
We created a detailed plan that considered all key aspects of the project. Thanks to extensive pre-planning, the operation was well executed, and the decommission was completed on time.
The customer was very impressed with our meticulous organisation, not to mention how smooth the process was from start to finish.
Recent case studies

A fast recovery for a large waste processing plant in Yorkshire
Our expert team developed a new control module that was an improvement on the human machine interface (HMI) and led to a much more durable setup.

Improving performance at a poultry processing facility in Lincolnshire
Our team designed, built, and installed new panels which have since been integrated with the existing odour control system.

A speedy service for a poultry processing factory in the West Midlands
Thanks to extensive pre-planning, the operation was well executed, and the decommission was completed on time.